传祺M8订金千万不能付,本人已上当

    本人22号下午去当地广汽传祺(江阴市金海迪汽车)店里看车,看了传祺M8车型新款刚上市不久,外观大气,7座。我个人有意向想买,当时销售告诉我们这个车型很紧俏,要提前预定,你可以通过传祺APP付订金8888元,店里老板也在场亲口说订金先付,不买随时可以退。老板都这样说了,我当时也考虑想买的就现场在4S店销售员协助操作下付了8888元定金。 
    晚上回去后家人不建议我买这车太大了,本来买这车也是想带这一家子出去自驾游方便,但买车高兴的事情弄的家里不开心没必要。重点来了。第二天23号下午我微信通知销售说车子我暂时不买了先把我订金退给我。销售一句话把我气懵了,订金退不了。订金不是我店里收到,是集团APP收的钱。本来APP付了订金,我自己手机有退款通道按钮,但是当地经销商暗地里骚操作,我付订金当天,在APP上把订车-提交订单给厂家-厂家按订单排交期-再生产汽车-再物流运输-最后才新车到店。等我第二天23号要APP退订金时,显示我已经到最后一部交车了。
   现在打电话广汽传祺客服投诉,回复我的车已经到店无法修改中,订车我只是付订金,余款没付,合同也没签!!!他们厂家就一天时间把我订的车生产完成还运输到店等我交车了,这强买强卖的生意让我吓傻了。 
   这事情发生到现在广汽传祺总部厂家到现在都没有跟我联系沟通这到底什么回事,海报上写的明明白白30天无理由退订。到我22号付定金,23号要退就不行。为什么??
   发这个贴也是希望各位车友买车时尤其付定金时候一定要慎重!!下面截图是我买车付定金图片,本人对段文章内容真实有效。
·······················································································································································································································································································
  后续: 今天7/31号我已收到订金退款8888元,感谢汽车之家跟网友们的支持,另外12315有用。23号要求4S店退定金到31号退到订金,这中途发生了很多不愉快的事情,在这也不想多细说了。实践证明如果4S同意退款  钱当天实时就能到账的!!!!但还是要吐槽一下广汽传祺400投诉电话,我打过多次。至今总部厂家一次都没有回复我要退订金的诉求。非常非常傲慢!!!所以使得当地经销商(江阴市金海迪汽车)这么霸道,无视消费者正常诉求。最后广汽传祺对你说声再见,我不会再买广汽传祺旗下任何一款车 永远不会。在此退汽车订金事情已处理结束,我这段经历已成过往,也希望各位网友买到自己心仪的汽车!!!
 




打开汽车之家 阅读体验更好
举报/纠错
2026/3/27 12:49:17